Home/Real Estate and Industrial Land/Industrial land/ZAE Kœnigsmacker-Malling, at the crossroads of three borders
Remonter en haut de page
ZAE Kœnigsmacker-Malling, at the crossroads of three borders ZAE Kœnigsmacker-Malling, at the crossroads of three borders ZAE Kœnigsmacker-Malling, at the crossroads of three borders

ZAE Kœnigsmacker-Malling, at the crossroads of three borders

Koenigsmacker-Malling 5,5 ha with future extension Price for serviced sqm: between €30 and €75 excl. VAT/m²

Area summary

  • Total surface area: 10 ha.
  • Available surface area: 5,5 ha with future extension.
  • Commercial, industrial, and small-business park.
  • Ideally located along the departmental road 654 that links Thionville to trier.
  • Right next to the yutz bypass, less than 15 minutes from the A31 motorway and Thionville.
  • 10 minutes from the Franco-German-Luxembourg border.
  • 20,000 vehicles a day.
  • 20,000 inhabitants less than 10 minutes away.

Services provided

Water

  • PE 63.

Electricity

  • MV and LV.
  • Available electrical power ratings to be validated with ENEDIS (French electricity company) depending on the project: low voltage: up to 249 kVA and medium voltage: private electrical substation from 250 kVA.

Gas

  • Rating 4 bar, PE 110mm.

Drainage and sewerage disposal

  • Wastewater: cast iron 200 mm.
  • Rainwater: PVC 315 mm.

Numerique

  • Fibre: coverage area.

Employee services

  • 2 day nurseries.

Connections

Roads

  • To the west: the A31 motorway (Dijon – Luxembourg). To the south: the A4 motorway (Paris – Strasbourg).
  • To the east and north: the A620 motorway (Saarbrücken – Luxembourg).

Airport

  • Luxembourg City International Airport.
  • Lorraine Airport.

Railway

  • Three TGV high-speed train stations: Metz, Thionville, Lorraine TGV to take the eastern high-speed train (TGV Est) and a dense Grand Est TER regional express train network.

River

  • Inland waterway (wide gauge to the Rhine).

Further informations

On-site accessibility

  • Departmental road 654 with roundabout for easy access and link to the other bank of the Moselle via the Malling-Gavisse bridge

Surveys already completed

  • Preventive archaeology, impact assessment, environmental assessment, water legislation assessment, soil mechanics analysis, urban planning review

Further informations

  • Potential to construct a building with a height of more than 15 m: no (14 m).
  • Land type: owned by the Communauté de Communes de l’Arc Mosellan (Arc Mosellan Community of municipalities).
  • Site zoning: 1AUX (intended for small business, industrial, commercial, service and office activities).

Main companies located on the site

  • LIDL / PEUGEOT / PIZZA FREDDY / LIVMAT.

Localisation

Ou appellez nous directement au +33 (0)3 87 37 57 80