- Total surface : 115 hectares
- Available area: 2,8 hectare
- Surface area of the largest plot available: 1,5 hectare
- Rural area around the site
- Vocational high school in the north of the area
- Located 3km south of Forbach
- Direct access to the A32-E50 Metz-Sarrebruck highway
- 15 km from the German border
Technopole – Forbach South
Area summary
Services provided
Water
- 600 m3 tower tank
Electricity
- Possibility of connection in very high or high voltage (63 or 220 KV)
- Medium voltage supply 20 KV
- Low voltage transformers installed in the area
Gas
- Proximity of a high pressure GDF transport feeder
- Gas supply to the site at a pressure of 4 bar
Sanitation
- Separative type. Water and industrial effluents must be treated before discharge
- Wastewater is discharged into the urban wastewater treatment plant of 25 000 Eq./inhabitant (10 000 Eq./inhabitant available)
- Rainwater is discharged through a 1200 mm diameter pipe into a basin and then into the Bousbach stream
Digital
- Fibre optic network
Connections
Roads
- Access via the 4-lane RD 31 bis Forbach-Sarreguemines
- Connection to :
- the A4/A6 Paris-Metz-Frankfurt/Main motorways with links to Nancy, Lille and Lyon
- the A8/A620 Stuttgart-Saarbrücken-Luxembourg-Brussels
- the A4 motorway to Strasbourg and Basel
Airport
- Saarbrücken-Ensheim airport 20 km away (connections to major German cities)
- Metz-Nancy-Lorraine airport 60 km away (connections to the main French cities)
- Luxembourg-Findel International Airport 120 km away
- Strasbourg-Entzheim Airport 130 km away (connections to France and Europe)
- Frankfurt-Hahn airport 120 km away (European connections + international freight)
Railway
- East Paris TGV (high speed train). Connections to Paris and Frankfurt.
- Metz-Saarbrücken regional train line (half-hourly intervals)
River
- Canal des Houillères de la Sarre at Grosbliederstroff, 10 km away (300 T barges)
- Saar canalized to European gauge at Dillingen, 35 km away (Germany)
Further information
Accessibility on site
- Internal services with 12 m right-of-way (roadways and landscaped shoulders). Complete interchange on the Forbach-Sarreguemines expressway which runs alongside the site
Studies already carried out
- Preventive archaeology, impact study, environmental assessment, water law study, soil mechanics study, urban planning study
Main companies
- SEW USOCOME / CABLRERIES LAPP / HYDAC / VAN HEES / ELYSEE COSMETIQUES / BATIFER / MESURA / LABORATOIRES JUVA PRODUCTION / ALIZE PLANETE PUZZLES…
Localisation
Ou appellez nous directement au +33 (0)3 87 37 57 80